You don't have javascript enabled. Good luck with that.
Pencarian
PT Aetra Masih Kekurangan Pasokan Air Baku

PT Aetra Still Lacking of Raw Water Supply

PT Aetra Air Jakarta until this time is still lacking of raw water supply. The lack is up to 3-30 percent. Water supply to serve 2 installation of Water Processing (IPA) is up to 9,600 liters per second. But the water supply is still way below the number.

Raw water supply of Aetra cannot be fulfilled all

Operation Director of PT Aetra Air Jakarta, Lintong Hutasoit stated that water supply in 2 IPA cannot be fulfilled yet by Perum Jasa Tirta II. The two IPA are in Buaran and Pulogadung. Water supply for those IPA fully depend on Jatiluhur Dam.

"Raw water supply of Aetra cannot be fulfilled all," said Hutasoit, during media gathering, in Yogyakarta, Thursday (11/19).

January-October, PT Aetra Obtained 12,000 New Customers

He mentioned that such condition makes his side have to decline clean water production until 25 percent.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1372 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1033 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye960 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye832 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye734 personAldi Geri Lumban Tobing